Fukushima River and National Highway Office

 

Flood prevention construction method

What are the most important flood prevention points?  | Flood prevention construction method

Flood prevention construction is the emergency measures taken to keep levee functional if it has sustained damage during a flood disaster.

 

Flood prevention construction method

Turn build Add thickness to levee back slopes to prevent destruction.
Sheets (Omotemushirohari [tarpaulin]) Prevent river side collapse. Fill in the holes leaking water.
Moon Ring Prevent levee washout by stopping leaking openings from expanding by pilling sandbags to minimize the water pressure caused by difference in water level between the river and the leakage openings.
Kamadan construction Pile up sandbags at the center of water leakage openings and utilize water pressure to stop the leakage.
Tree flowing (sinking) Soften the running stream. Prevent river side collapse. Prevent river side still water loss (gentle stream section).
Sandbag Arena (Sandbag Stockpile) Prevent overflow by piling sandbags at levee crown

Back